The short answer
- Under construction: 5% of everything the builder charges for the flat
- Affordable flat: 1%, if the total is up to ₹45 lakh and carpet area is up to 90 sq m (968 sq ft)
- Ready flat with completion certificate: no GST, if you pay everything after the certificate
- Resale: no GST
GST is on top of stamp duty and registration, which you pay on every flat.
GST calculator for Pune flats
Anything else the builder charges for the flat. It takes the same GST and counts toward the ₹45 lakh limit.
From the agreement or RERA page, not the brochure's saleable area.
| Amount chargedPrice + extras | ₹78.00 L |
|---|---|
| Up to ₹45 lakh?Affordable price test | No |
| Up to 90 sq m (968 sq ft)?Affordable area test, Pune | Yes |
| GST rateOther residential | 5% |
| GST | ₹3.90 L |
5% applies to the full amount. The land deduction is already built into the rate, so nothing more comes off.
When GST applies
| You are buying | GST |
|---|---|
| Under-construction flat from a builder | 5%, or 1% if affordable |
| Ready flat, whole price paid after the completion certificate | None |
| Ready flat, but you paid some instalments before the certificate | On those instalments |
| Resale flat from an owner | None |
| Plot of land | None |
| Shop or office under construction | 12% (5% in a mostly residential project) |
The builder collects GST with each payment it demands, so it is spread across the construction-linked plan rather than paid at once.
Does your flat qualify for 1%?
Both tests must be met:
- Price: the gross amount charged is no more than ₹45 lakh. That includes parking, floor rise, development and common facility charges, not just the base price.
- Size: RERA carpet area is no more than 90 sq m (about 968 sq ft). Pune is not a "metropolitan city" under the GST notification, so the stricter 60 sq m limit for Mumbai, Delhi NCR and others does not apply.
In practice, the size test rarely bites in Pune: a typical 2BHK has well under 968 sq ft of carpet area. The price test is usually the one that decides it.
The ₹45 lakh cliff
The rate jumps from 1% to 5% the moment the total crosses ₹45 lakh. A flat at ₹45.5 lakh pays ₹1.82 L more GST than the same flat at ₹45 lakh. If you are close to the line, check exactly what the total includes.
Worked examples
| Under-construction flat | Total charged | Rate | GST |
|---|---|---|---|
| 1BHK, 450 sq ft carpet | ₹38.00 L | 1% | ₹38,000 |
| 2BHK, 650 sq ft carpet | ₹45.00 L | 1% | ₹45,000 |
| Same 2BHK, ₹50,000 more | ₹45.50 L | 5% | ₹2.27 L |
| 2BHK, 750 sq ft carpet | ₹80.00 L | 5% | ₹4.00 L |
| 3BHK, 1,100 sq ft carpet | ₹1.40 Cr | 5% | ₹7.00 L |
The one-third land deduction, explained
GST taxes construction, not land. Instead of valuing the land in every project, the law deems one-third of the price to be land and taxes the other two-thirds at 7.5% (1.5% for affordable flats). Two-thirds of 7.5% is 5%, so the quoted 5% is already the rate on the full price.
On an ₹80 lakh flat: two-thirds is ₹53.33 lakh, and 7.5% of that is ₹4 lakh, exactly 5% of ₹80 lakh. If a builder's demand letter shows more than 5% of the amount charged, ask why.
Why GST on a flat is a pure cost
Since April 2019, builders paying 5% or 1% cannot claim input tax credit on cement, steel and other materials, and buyers cannot claim back the GST they pay on a home. It is part of what the flat costs you, the same as stamp duty. A few projects that were already running in 2019 chose to stay on the old 12% (8% affordable) rates with credit; if your project started before April 2019, check which rate your agreement uses.
Under construction or ready: what GST changes
On an ₹80 lakh flat, GST adds ₹4.00 L if you book it under construction. The same flat bought after the completion certificate carries no GST, though ready flats are often priced higher and you lose the time to pay in stages. Compare the all-in figures with our total cost calculator and read new vs resale flats.
Frequently asked questions
What is the GST on an under-construction flat in Pune?
5% of the amount charged, without input tax credit. If the flat qualifies as affordable housing (gross amount up to ₹45 lakh and RERA carpet area up to 90 sq m in Pune), it is 1%. These rates have applied since 1 April 2019 and were not changed by the September 2025 GST rate changes.
Is there GST on a ready-to-move flat?
No, if you pay the entire price after the completion certificate or first occupation. Any amount paid to the builder before that certificate carries GST.
Is there GST on a resale flat?
No. A sale from one owner to another is a sale of immovable property and is outside GST. You still pay stamp duty and registration. A broker's commission carries 18% GST.
Why is the affordable limit 90 sq m in Pune and not 60 sq m?
The GST notification sets 60 sq m only for the listed metropolitan cities: Bengaluru, Chennai, Delhi NCR, Hyderabad, Kolkata and the Mumbai Metropolitan Region. Pune is not on the list, so the 90 sq m limit (about 968 sq ft carpet) applies. The ₹45 lakh price limit is the same everywhere.
Should the builder deduct one-third for land before charging 5%?
No. The law taxes two-thirds of the price at 7.5% (1.5% for affordable flats), deeming one-third to be land. That works out to exactly 5% (or 1%) of the full price. A builder should charge 5% of the amount, with no further deduction and nothing more.
Is GST charged on parking, floor rise and development charges?
Yes, when the builder charges them for an under-construction flat they are part of the amount charged, take the same rate, and count toward the ₹45 lakh affordable limit.
Is GST charged on society maintenance?
Only above ₹7,500 per member per month. If the society charges more than that, GST at 18% applies to the whole amount, not just the excess (CBIC Circular 109/28/2019).
What is the GST on a shop or office under construction?
Usually 12% with input tax credit for the builder. If the shop is in a mostly residential project, where commercial space is no more than 15% of the carpet area, it is 5% without credit.
Sources
- Notification 11/2017-Central Tax (Rate), as amended by Notification 03/2019-Central Tax (Rate), effective 1 April 2019
- GST Council, 33rd meeting recommendations (Press Information Bureau, 24 February 2019)
- CBIC, "GST: Concept & Status" (May 2019), section on real estate
- Office of the Chief Commissioner of State Tax, Gujarat: FAQs on the real estate sector (5 May 2026)
- CBIC Circular 109/28/2019-GST on society maintenance charges
Last checked 25 November 2026. This is general information, not tax advice; confirm your case with a CA before you sign.